    摘要:

    在对河北省廊坊市规划区液化饱和砂土分布及危害调查研究的基础上,提出采用振冲碎石桩法、桩基础方法、CFG桩复合地基技术进行防治饱和砂土液化的措施。

    Abstract:

    Based on the investigation on the distribution of liquefied saturated sand in the planned district in Langfang of Hebei Province and study analysis on the hazard, vibro replacement stone column, pile foundation and CFG pile composite ground technology were suggested to control the saturated sand liquefaction.

    参考文献
    相似文献
    引证文献
引用本文

王德强,王行军,宫进忠.廊坊市规划区饱和砂土液化的危害及防治措施[J].钻探工程,2010,37(4):62-64.
WANG De-qiang, WANG Xing-jun, GONG Jin-zhong. Hazard of Saturated Sand Liquefaction in Planned District of Langfang City and the Contral Measure[J]. Drilling Engineering, 2010,37(4):62-64.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2010-01-21
  • 最后修改日期:2010-01-21
  • 录用日期:2010-03-03
  • 在线发布日期: 2010-05-26
  • 出版日期: 2010-04-25
文章二维码