In order to solve the technical difficulties of complex formation drilling for coal exploration in Xuyong dam of Sichuan, analysis was made on the encountered complex formations. The paper introduced the formation characteristics, borehole construction, washing fluid, wall protection & leakage control and the application of new technology.
参考文献
相似文献
引证文献
引用本文
黄平.河坝井田复杂地层钻探施工技术难点及对策[J].钻探工程,2010,37(5):27-30.HUANG Ping. Technical Difficulties in Drilling Construction of Complex Formation[J]. Drilling Engineering, 2010,37(5):27-30.