In Shanghai, a great depth and large scale excavation engineering of complex environment and high deformation requirement was constructed with water insulation by cementsoil mixing pile + twofloor support, hierarchical partition, excavating in limited interval and information construction, the engineering was carried smoothly with satisfactory project results.
参考文献
相似文献
引证文献
引用本文
谢石连,丁其锋,卢玉南.钻孔灌注桩在软土地区深大基坑围护工程中的应用[J].钻探工程,2010,37(5):59-63.XIE Shi-lian, DING Qi-feng, LU Yu-nan. Application of Cast-in-place Bored Pile for in Soft Soil Area[J]. Drilling Engineering, 2010,37(5):59-63.