Based on the analysis on construction methods for large-scale sea reclamation project in Beibu gulf and classification of mechanism of different rock and soil combinative characteristics; and according to the foundation treatment and construction experience of different projects in this area, the optimized methods of construction and treatment for different ground and foundation were summed up.
参考文献
相似文献
引证文献
引用本文
胡纯龙.广西北部湾填海造陆工程地基基础及施工方法[J].钻探工程,2009,36(6):51-54.HU Chun-long. Foundation of Sea Reclamation Project in Beibu Gulf of Guananxi and the Construction Method[J]. Drilling Engineering, 2009,36(6):51-54.