This paper introduces the drilling fluids and lost circulation control technology applied in Jinchang gold mine, and takes an example of diamond wire-line coring drilling well (ZK-0003) to illustrate the high efficiency, low cost and stable hole wall. The drilling fluid system had good effect of caving prevention and lost control with strong adaptability and suitable viscosity; the formed thin mud-cake was dense and tough, with which low carrying capability and serious water loss were solved in small diameter wire-line coring drilling.
参考文献
相似文献
引证文献
引用本文
刘维平,胡远彪.牡丹江金厂矿区钻井液选用与堵漏技术[J].钻探工程,2009,36(6):13-15.LIU Wei-ping, HU Yuan-biao. Drilling Fluids Selection and Lost Circulation Control Technology in Jinchang Gold Mine[J]. Drilling Engineering, 2009,36(6):13-15.