According to the cable opening and hole construction in Yangchangwan coal mine, the optimum technology and technical requirement and effective prevention & treatment on broken leakage formation for special large diameter drilling construction in Ningdong mine were summed up. Advanced non-return valve cementing technology was successfully applied for large diameter borehole cementing process, and treatment methods of large diameter downhole trouble were put forward.
参考文献
相似文献
引证文献
引用本文
米万隆,李学军,李娟,等.宁夏羊场湾煤矿复杂地层大口径电缆孔施工技术[J].钻探工程,2010,37(4):27-30.MI Wan-long, LI Xue-jun, LI Juan, et al. Construction Technical on a Large Diameter Cable Opening and Hole in Complex Formation of Ningxia[J]. Drilling Engineering, 2010,37(4):27-30.