Because of the blockfalling, collapsing, local oversizing and more sediment in water sensitive formation, drilling broken and burying drilling occurred in the boring construction in a phosphate mine in Guizhou. Small diameter cone bit positioning deflection by wireline coring with steel ball supporting was used to solve the problem economically.
参考文献
相似文献
引证文献
引用本文
何远东,高波,何远洪,等.绳索取心钢球偏斜技术原理及应用[J].钻探工程,2010,37(4):37-39.HE Yuan-dong, GAO Bo, HE Yuan-hong, et al. Principle of Deflection Technology of Wire-line Coring with Steel Ball and the Application[J]. Drilling Engineering, 2010,37(4):37-39.