长白沿江矿区勘查ZK0902孔施工技术
DOI:
CSTR:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

P634

基金项目:


Construction Technology of ZK0902 Exploration Hole in Yanjiang Mine of Changbai in Jilin
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    长白沿江矿区钻探施工中遇到的主要问题是煤系地层水化膨胀,形成陷塘,钻孔坍塌、掉块,深部灰岩蚀变,形成溶洞,严重漏失,导致施工周期延长,现场及时分析原因,采用针对性的工艺措施,成功地解决了上述问题,圆满地完成了矿区施工任务。

    Abstract:

    Hydration swelling in coal measure strata with subsidence pool forming was the main difficulty in drilling construction in Yanjiang mine of Changbai; and hole collapsing, block-falling and deep limestone alteration formed karst cave with serious leakage and long construction period. Field analysis was made to solve the above problems by specific technologies.

    参考文献
    相似文献
    引证文献
引用本文

全志刚,王禹,杨春柳.长白沿江矿区勘查ZK0902孔施工技术[J].钻探工程,2010,37(4):34-36.
QUAN Zhi-gang, WANG Yu, YANG Chun-liu. Construction Technology of ZK0902 Exploration Hole in Yanjiang Mine of Changbai in Jilin[J]. Drilling Engineering, 2010,37(4):34-36.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2009-12-17
  • 最后修改日期:2009-12-17
  • 录用日期:2010-01-10
  • 在线发布日期: 2010-05-25
  • 出版日期: 2010-04-25
文章二维码