云南鲁基厂水电站坝基振冲试验与施工
DOI:
CSTR:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

TV541

基金项目:


Vibroflotation Test and Construction of Dam Foundation of Lujichang Hydropower Station in Yunnan
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    鲁基厂水电站坝基建在覆盖层地基上,地基为砂卵砾石层、块石层、泥质粉细砂等地层互层,天然地基承载力不能满足设计要求,采用180 kW大功率电动振冲器加钻机引孔的施工工艺,解决了地层复杂、振冲加固处理深度大的施工技术难题。

    Abstract:

    The dam foundation of Lujichang hydropower station was built on overburden formation with interlayer of sand gravel, block stone and shaly fine sand formation, the bearing capacity of natural foundation could not satisfy the design requirement; 180 kW high power electric vibroflotation device and drilling rig were applied to solve the construction difficulties in complex formation and deep vibroflotation consolidation.

    参考文献
    相似文献
    引证文献
引用本文

方成名,李全福,何凤.云南鲁基厂水电站坝基振冲试验与施工[J].钻探工程,2010,37(4):54-57.
FANG Cheng-ming, LI Quan-fu, HE Feng. Vibroflotation Test and Construction of Dam Foundation of Lujichang Hydropower Station in Yunnan[J]. Drilling Engineering, 2010,37(4):54-57.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2009-12-10
  • 最后修改日期:2009-12-10
  • 录用日期:2009-12-24
  • 在线发布日期: 2010-05-26
  • 出版日期: 2010-04-25
文章二维码