In order to make clear the karst cave distribution beneath roadbed at Yesanguan section of 318 national highway, GPR was used for delineating. By the analysis on the stability of the karst disturbed zone, the jet grouting method was chosen for the reinforcement. The strengthening region was detected again, and the effect is very significant.
参考文献
相似文献
引证文献
引用本文
胡朝彬,戴苗,王宝勋,等.公路路基下溶洞的探测与加固处理实践[J].钻探工程,2010,37(8):67-69.HU Chao-bin, DAI Miao, WANG Bao-xun, et al. Detection and Reinforcement Practice of Karst Cave Beneath Roadbed[J]. Drilling Engineering, 2010,37(8):67-69.