    结合北京地铁十号线熊猫环岛车站降水工程实践,介绍了利用反循环钻机施工管井工艺、抽渗结合法进行基坑降水的方法;并对其地下水监测及沉降监测等施工技术、降水对周围环境的影响及防治措施,以及施工中出现的问题和处理经验进行总结。

    Abstract:

    Based on the practice of precipitation project in Xiongmaohuandao station of Beijing subway Line10#, tubular well construction technology with reverse circulation drill and foundation pit dewatering by the combination of suction and seepage were introduced; construction technology of groundwater monitoring and settlement monitoring, environmental impact of dewatering and the countermeasures, problems in construction and the treatment experience were together summed up.

    参考文献
    相似文献
    引证文献
引用本文

王维献.北京地铁十号线熊猫环岛车站降水工程技术[J].钻探工程,2010,37(3):42-45,48.
WANG Wei-xian. Dewatering Technology of Subway Station Construction in Xiongmaohuandao Station of Beijing Subway Line10[J]. Drilling Engineering, 2010,37(3):42-45,48.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2009-11-23
  • 最后修改日期:2009-11-23
  • 录用日期:2009-12-10
  • 在线发布日期: 2010-03-30
  • 出版日期: 2010-03-25
文章二维码