Two kinds of disassembly and recycling bars were introduced, they were used with lower cost but good effect, and the workload for pile-top removal was reduced with accurate location of steel reinforcement cage and less damage to pile body.
参考文献
相似文献
引证文献
引用本文
蔡文盛.两种钻孔灌注桩可拆卸吊筋的制作与使用[J].钻探工程,2009,36(4):59-62.CAI Wen-sheng. Manufacture and Application of Two Disassembly Bars for Bored Grouting Pile[J]. Drilling Engineering, 2009,36(4):59-62.