By the analysis on the shield construction method and machinery allocation for Minzhi to Wuhe tunnel interval of Shenzhen metro No.5 Line, subway tunnel shield supporting equipment selection for subway tunnel shield interval rapid construction was summed up to accumulate experience the similar project.
参考文献
相似文献
引证文献
引用本文
李伟,黄琦恒.深圳地铁隧道区间盾构施工与配套机械配置分析[J].钻探工程,2010,37(5):78-81,72.LI Wei, HUANG Qi-heng. Analysis on Allocation of Tunnel Interval Shield Construction and Auxiliary Machinery[J]. Drilling Engineering, 2010,37(5):78-81,72.