Based on the engineering case in Jiqingling tunnel, risk analysis was made on the construction of tunnel entrance in poor geological condition with shallow-buried and unbalanced pressure. Integrated prevention measures for geological diseases were put forward with early support strengthening, short cycling excavating and early support closing.
参考文献
相似文献
引证文献
引用本文
王海明.吉青岭隧道浅埋偏压进口段施工风险分析及综合防治措施[J].钻探工程,2010,37(1):79-81,66.WANG Hai-ming. Risk Analysis on Entrance with Shallow-buried and Unbalanced Pressure of Jiqingling Tunnel and the Measures[J]. Drilling Engineering, 2010,37(1):79-81,66.