The paper discussed common problems of pipe roof support engineering in soft ground and presented the optimization technology by tests on borehole construction methods with existing equipments.
赵宪富,施泽龙,台沐礼.长春火车站南北地下通道管棚支护施工工艺[J].钻探工程,2009,36(3):79-80. ZHAO Xian-fu, SHI Ze-long, TAI Mu-li. Construction Technology of Pipe Roof Support for Underground Passage of Changchun Railway Station[J]. Drilling Engineering, 2009,36(3):79-80.