The paper discussed common problems of pipe roof support engineering in soft ground and presented the optimization technology by tests on borehole construction methods with existing equipments.
参考文献
相似文献
引证文献
引用本文
赵宪富,施泽龙,台沐礼.长春火车站南北地下通道管棚支护施工工艺[J].钻探工程,2009,36(3):79-80.ZHAO Xian-fu, SHI Ze-long, TAI Mu-li. Construction Technology of Pipe Roof Support for Underground Passage of Changchun Railway Station[J]. Drilling Engineering, 2009,36(3):79-80.