    摘要:

    通过印尼AWAR-AWAR 2×350MW燃煤电站桩基2次试桩,改进施工工艺,提高了软质、松散、裂隙、孔洞和蜂窝结构发育、严重漏水强风化石灰岩地层的桩基承载力,具有很好的经济和社会效益。

    Abstract:

    By the secondary pile testing in AWAR-AWAR 2×350MW pulverized power plant in Indonesia, the construction technology was modified with the improvement on bearing capacity of pile foundation in soft, loose, fractured, cavity and honeycomb structure developing and weathering limestone formation.

    参考文献
    相似文献
    引证文献
引用本文

王德武,张兆金.提高印尼AWAR-AWAR燃煤电站桩基承载力的技术措施[J].钻探工程,2009,36(8):69-72.
WANG De-wu, ZHANG Zhao-jin. Technical Measures for Improving Bearing Capacity of Pile Foundation of AWAR-AWAR Pulverized Power Plant in Indonesia[J]. Drilling Engineering, 2009,36(8):69-72.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2009-07-16
  • 最后修改日期:2009-07-16
  • 录用日期:2009-07-29
  • 在线发布日期: 2009-09-01
  • 出版日期: 2009-08-25
文章二维码