王德武,张兆金.提高印尼AWAR-AWAR燃煤电站桩基承载力的技术措施[J].钻探工程,2009,36(8):69-72.WANG De-wu, ZHANG Zhao-jin. Technical Measures for Improving Bearing Capacity of Pile Foundation of AWAR-AWAR Pulverized Power Plant in Indonesia[J]. Drilling Engineering, 2009,36(8):69-72.
复制