Effective calcium-treated mud was testing prepared for the underground salt-water environment with high sodium ion, and the serious pile hole shrinkage and un-position of steel reinforcement cage were solved. It can be the reference for the construction in the similar formation.
参考文献
相似文献
引证文献
引用本文
林弘焱.钙处理泥浆在含盐地层钻孔灌注桩施工中的应用[J].钻探工程,2009,36(12):57-58.LIN Hong-yan. Application of Calcium-treated Mud in Construction of Bored Cast-in-place Pile in Salt Formation[J]. Drilling Engineering, 2009,36(12):57-58.