Bored cast-in-place pile post grouting can promote the bearing capacity of single pile, guarantee the pile construction quality and save construction cost, which fit to bored cast-in-place pile engineering in bearing layers of sandy gravel and gravel soil. With the field case, the paper detailed the reinforcement mechanism, construction technology and treatment measures for construction difficulties.
参考文献
相似文献
引证文献
引用本文
王德武,张辉义.杭州滨江区钻孔灌注桩桩端后压浆施工实践[J].钻探工程,2009,36(12):54-56.WANG De-wu, ZHANG Hui-yi. Construction Practice of Bored Cast-in-place Pile Post Grouting in Hangzhou[J]. Drilling Engineering, 2009,36(12):54-56.