The left resistance block of Jinping I hydropower station on Yalong River was built on f2、f5、f8、f42-9 faults and the weak belt with lamprophyre vein and deep fractures, reinforcement treatment was necessary. Chemical compound grouting was developed based on cement grouting, the test was introduced in selection of chemical grouting material, determination of grouting parameters and grouting construction technology. Based on the test result, analysis was made on grouting feasibility in lamprophyre vein and testing evaluation was made on grouting effect by the comparative analysis on core, permeability of surrounding rocks, rock acoustic wave and deformation modulus in borehole, it showed that chemical compound grouting has obvious effect on reinforcement treatment in lamprophyre vein. The paper also gives the construction suggestion according to the grouting test.
参考文献
相似文献
引证文献
引用本文
王胜,黄润秋,祝华平,等.锦屏一级水电站煌斑岩脉化学复合灌浆试验研究[J].钻探工程,2009,36(11):60-64.王胜,HUANG Run-qiu, ZHU Hua-ping, et al. Analysis on Chemical Compound Grouting Tests of Jingping Ⅰ Hydropower Station Lamprophyre Dike[J]. Drilling Engineering, 2009,36(11):60-64.