Hole shrinkage often occurs while bored-grouting pile is constructed in expansive clay, the cause is analyzed with engineering practice, “interval construction” is discussed with the effect presenting, which solved the hole shrinkage problem.
参考文献
相似文献
引证文献
引用本文
代万庆.膨胀土地层钻孔灌注桩缩径原因及预防措施[J].钻探工程,2009,36(11):50-51,75.代万庆. Cause of Hole Shrinkage of Bored-grouting Pile in Expansive Soil and the Prevention Measures[J]. Drilling Engineering, 2009,36(11):50-51,75.