Construction of Anchor Cable with Large-angle Upward Hole in Tailrace Surge Tank of JinpingI Hydropower Station
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    锦屏一级水电站地下厂房尾水调压室顶拱发育有f14、f18断层及煌斑岩脉,开挖后出露断层及其影响带岩体破碎,风化强烈,围岩不稳定,为了洞室稳定及施工安全,设计采用预应力锚索进行加强支护。介绍了尾水调压室大角度上仰孔锚索的施工方法。

    Abstract:

    f14, f18 fault and lamprophyre veins are developed in the top arch of tailrace surge tank in underground powerhouse of Jinping I hydropower station, the fault and the influence line was exposed after excavation with broken rock, strong weathering and instable surrounding rock. Pre-stressed anchor cable was designed to strengthen the support for cavity stability and construction safety. The papermainly introduced the construction method for anchor cable with large-angle upward hole in tailrace surge tank.

    参考文献
    相似文献
    引证文献
引用本文

黄辉.锦屏一级电站尾水调压室大角度上仰孔锚索施工[J].钻探工程,2009,36(2):55-58.
HUANG Hui. Construction of Anchor Cable with Large-angle Upward Hole in Tailrace Surge Tank of JinpingI Hydropower Station[J]. Drilling Engineering, 2009,36(2):55-58.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2008-07-14
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期:
  • 出版日期: 2009-02-25
文章二维码