Through many times of technical innovation and production practice, 3512 m drilling depth has been achieved by airlift reverse circulation drilling technology. Compared with the slurry positive circulation, leakage in target layer is controlled with higher efficiency, lower cost, easy wellwashing and completion.
参考文献
相似文献
引证文献
引用本文
王玉国,肖海龙,谢连生.气举反循环钻进工艺在3512 m深的京热164号井中的应用[J].钻探工程,2009,36(2):9-11.WANG Yu-guo, XIAO Hai-long, XIE Lian-sheng. Application of Airlift Reverse Circulation Drilling in Jingre 164# Well of 3512 m Depth[J]. Drilling Engineering, 2009,36(2):9-11.