It is difficult to carry out construction of bored cast-in-situ pile in the Karst area with high probability of quality problems. The article shows the analysis on the problems encountered during the course of bored piles construction in the Karst area, and it also provides the relevant technical countermeasures.
参考文献
相似文献
引证文献
引用本文
熊绍所,成润军.岩溶地区钻(冲)孔灌注桩施工的难点及其技术对策[J].钻探工程,2009,36(8):73-75,79.XIONG Shao-suo, CHEN Run-jun. Construction Difficulties of Bored Cast-in-situ Pile in Karst Area and the Technical Countermeasures[J]. Drilling Engineering, 2009,36(8):73-75,79.