    摘要:

    三峡库区滑坡治理工程采用锚杆格构、挡土墙、抗滑桩等综合治理方案。为增加滑坡体的稳定性,在抗滑桩的顶部施工超深预应力锚索,增加滑移带的法向应力,对滑坡体的稳定性至关重要。主要介绍了超深预应力锚索施工方法、锚索成孔技术、灌浆施工及张拉施工。

    Abstract:

    Comprehensive treatment with anchor lattice, retaining wall and anti-slide pile was adopted for landslide control project in Three Gorges Reservoir. In order to increase the slide stability, it is important to construct the ultra-deep pre-stressed anchoring cable at top end of the anti-slide pile and increase the normal stress of slip band. The paper introduced the construction of ultra-deep pre-stressed anchoring cable, borehole for anchor cable, grouting and tension construction.

    参考文献
    相似文献
    引证文献
引用本文

冯学知,李恒宝.超深预应力锚索在三峡库区滑坡治理工程中的应用[J].钻探工程,2009,36(10):68-70.
FENG Xue-zhi, LI Heng-bao. Application of Ultra-deep Pre-stressed Anchoring Cable in Landslide Control Project in the Three Gorges Reservoir[J]. Drilling Engineering, 2009,36(10):68-70.