Because of high-steep slope, difficulties are often encountered, such as drilling rig relocation & erection and borehole completion in crushed bottom. Anchor drill was selected and improved in order to meet the requirements for the anchor cable construction in accumulation body at high-steep slope; and meanwhile eccentric drill with casing was developed and manufactured, hoping to solve the difficulties of anchoring borehole construction in accumulation body at high-steep slope, overcome low efficiency and high cost.
参考文献
相似文献
引证文献
引用本文
吴丽,余江洪,陈礼仪,等.高陡边坡堆积体锚固钻孔配套机具研究[J].钻探工程,2009,36(8):15-17.21.WU Li, YU Jiang-hong, CHEN Li-yi, et al. Research on the Drilling Matching Machines for Accumulation Body Anchoring at High-steep Slope[J]. Drilling Engineering, 2009,36(8):15-17.21.