With some project examples, this article put common quality problems of CFG pile into two kinds: the error surpasses the standard stipulation for the geometry size and the physical performance destroyed and expired. And from this point, the influence to the bearing capacity of composite foundation was qualitative analyzed,primary cause of these problems and the countermeasures were put forward, and some suggestions were made on equipment and technology.
参考文献
相似文献
引证文献
引用本文
陈果,于跃生,赵绎钧.长螺旋钻机施工CFG桩常见质量问题及应对措施[J].钻探工程,2009,36(1):62-64,67.CHEN Guo, YU Yue-sheng, ZHAO Yi-jun. Common Quality Problem and Countermeasures on CFG Pile Constructed by Long Spiral Drilling Machine[J]. Drilling Engineering, 2009,36(1):62-64,67.