In 403 section of Shenzhen metro Line 4, borehole should be completed for end-bearing pile in spherical weathered granite with high strength, anisotropy and large inclined angle, which was only 20m to nearby buildings, so rotary drilling was adopted for safety. Composite drilling technology of drag bit cutting drilling, button roller bit compacting and rectification by annular coring bit was adopted with wall protection by slurry reverse circulation.
参考文献
相似文献
引证文献
引用本文
李福清,王元满,胡向东.球状风化孤石群内端承桩复合成孔施工技术[J].钻探工程,2009,36(1):43-48.LI Fu-qing, WANG Yuan-man, HU Xiang-dong. Composite Construction Technology of Boring for End-bearing Pile in Spherical Weathered Boulders[J]. Drilling Engineering, 2009,36(1):43-48.