Quaternary loose soil, heavy strong weathered rock stratum, borehole collapse, complex deep rock structure and leakage were encountered while drilling in Chigou copper mining area, analysis was made according to these problems to take the aimed measures.
参考文献
相似文献
引证文献
引用本文
柯玉军,杨鲁飞.池沟铜矿区岩心钻探施工中主要问题及解决办法[J].钻探工程,2009,36(1):22-24.KE Yu-jun, YANG Lu-fei. Main Problems of Coring Drilling Construction in Chigou Copper Mining Area and the Solution[J]. Drilling Engineering, 2009,36(1):22-24.