This paper introduced the primary principle and construction technology of composite pile with caliber bore-hole by a treatment engineering case of embankment slide on the left side of Chengdu-Ya’an highway K24+855~961 section, and described the key points of quality control for pivotal process.
参考文献
相似文献
引证文献
引用本文
肖德芬,吴宝和.小口径钻孔组合桩技术在地质灾害治理工程中的应用[J].钻探工程,2009,36(7):73-75.XIAO De-fen, WU Bao-he. Application of Composite Pile with Caliber Bore-hole for Geological Disaster Treatment Engineering[J]. Drilling Engineering, 2009,36(7):73-75.