Construction Technology of the First Grave-filled Geothermal Well in Renqiu
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    任丘市常规地热井存在含砂量高、孔壁易失稳等问题。在本区设计首眼填砾地热井,选择了φ178 mm/φ311 mm的管/孔径级配的成井结构。通过录井仪监测、泥浆性能控制等措施完成成孔施工;通过破壁替浆、静水填砾等程序完成成井施工。运行检验证明,施工工艺可行,成井质量可靠。

    Abstract:

    High sand content rate and unstable borehole wall exist in common geological well in Renqiu, and the gradation of 178mm pipe and 311mm diameter was chosen for the first gravel-filled geological well in this area. Borehole construction was completed under the logging instrument monitoring and mud property control; well construction was completed by -breaking mud layer of the wall and gravel-filling in static water level. It was proved the construction technology was feasible and quality of well completion was reliable by operation test.

    参考文献
    相似文献
    引证文献
引用本文

景龙,杨永明,常林祯,等.任丘市首眼填砾地热井施工工艺[J].钻探工程,2009,36(7):28-32.
JING Long, YANG Yong-ming, CHANG Lin-zhen, et al. Construction Technology of the First Grave-filled Geothermal Well in Renqiu[J]. Drilling Engineering, 2009,36(7):28-32.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2009-02-04
  • 最后修改日期:2009-02-04
  • 录用日期:2009-05-04
  • 在线发布日期: 2009-07-27
  • 出版日期: 2009-07-25
文章二维码