The article introduces the construction technology and its advantages of the cast-in-place engaged pile taken as the exterior-protected structure used in the construction of Metro Line 1 Zhanong Kou-East Railway Station in the middle range of wind envelope well drilling project of Hangzhou, and sums up the measures to control the construction quality.
参考文献
相似文献
引证文献
引用本文
谢勋,王钰.全套管钻孔咬合桩的施工及质量控制[J].钻探工程,2009,36(8):76-79.XIE Xun, WANG Yu. Elementary Introduction to Construction and Quality Control of Cast-in-place Engaged Pile[J]. Drilling Engineering, 2009,36(8):76-79.