Pile foundation of the main tower of palms-together dagoba in Famen Temple was designed for 100 years project service life. The project construction was controlled in alkali-aggregate reaction, borehole completion, sedimentary dregs, cement grouting and post-pressure grouting.
参考文献
相似文献
引证文献
引用本文
王凉生,王荣.法门寺合十舍利塔主体塔钻孔灌注桩桩身质量控制[J].钻探工程,2008,35(12):54-56.WANG Liang-sheng, WANG Rong. Quality Control on Bored Grouting Pile Body of Main Tower of Dagoba in Famen Temple[J]. Drilling Engineering, 2008,35(12):54-56.