三峡库区三期地质灾害防治监测预警的主要方法
DOI:
CSTR:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

基金项目:


Main Methods of Monitoring and Early-warning for Control of the Third Period of Geological hazard in Three Gorges Reservoir Region
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    主要介绍了三峡库区三期地质灾害防治监测预警专业监测系统工程的主要任务、工作内容、监测预警工程施工和主要监测预警方法,阐述了有效的监测工作在地质灾害防治工程中的重要意义,同时介绍了研制的新型监测仪器在三峡库区三期地质灾害防治监测工程中的应用。

    Abstract:

    This paper introduces the main assignments of the monitoring and early-warning system engineering for control of geological hazard, monitoring and early-warning construction and the main methods. The significance was expatiated on effective monitoring in control engineering of geological hazard, and the application of a newly developed monitoring instrument was presented, which was used in monitoring for control of the third period of geological hazard in Three Gorges reservoir region.

    参考文献
    相似文献
    引证文献
引用本文

季伟峰.三峡库区三期地质灾害防治监测预警的主要方法[J].钻探工程,2008,35(7):14-17.
JI Wei-feng. Main Methods of Monitoring and Early-warning for Control of the Third Period of Geological hazard in Three Gorges Reservoir Region[J]. Drilling Engineering, 2008,35(7):14-17.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2008-05-31
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期:
  • 出版日期:
文章二维码