The occurrence of slurry surge pressure and stability principle of borehole during bit-raising of the rotary drilling rig were introduced here. Computation model of surge pressure was also established in this paper. Surge pressure produced with each construction technological parameter was separately analyzed and calculated, and the calculating method of allow- able withdraw speed was presented.
参考文献
相似文献
引证文献
引用本文
孔伟,段新胜,刘朝阳,等.旋挖钻机提钻速度对井壁稳定的影响分析[J].钻探工程,2008,35(1):55-57.KONG Wei, DUAN Xin-sheng, LIU Zhao-yang, et al. Analysis on Influence of Withdraw Speed of Rotary Drilling Rig to Borehole Stability[J]. Drilling Engineering, 2008,35(1):55-57.