复杂地层暗挖隧道穿越人行天桥施工技术
DOI:
CSTR:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

U455.4

基金项目:


The Construction Technology for Underground Tunneling through the Pedestrian Overhead Bridge Foundation in Silt Stratum
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    以正在建设中的北京地铁十号线双井一劲松区间工程暗挖隧道为例,叙述了浅埋隧道穿越人行天桥的施工技术,并通过监控量测对该技术进行了检验。

    Abstract:

    Construction technique was described about shallow tunneling through pedestrian overhead bridge foundation with the constructing project of section between Shuangjing and Jinsong of Beijing metro line 10, and the technology was tested through monitoring measurment.

    参考文献
    相似文献
    引证文献
引用本文

胡方田.复杂地层暗挖隧道穿越人行天桥施工技术[J].钻探工程,2007,34(7):52-54.
HU Fang-tian. The Construction Technology for Underground Tunneling through the Pedestrian Overhead Bridge Foundation in Silt Stratum[J]. Drilling Engineering, 2007,34(7):52-54.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期:
  • 出版日期:
文章二维码