The article detailed completion of parameter well for coalbed methane, technical specification and construction process with field cases, especially summed up coring and preventing deviation in order to drill vertically during drilling.
参考文献
相似文献
引证文献
引用本文
吴小建.沁南煤层气参数井钻井工艺[J].钻探工程,2007,34(5):43-44,46.WU Xiao-jian. Drilling Technology of Parameter Well for CoMbed Methane in the South of Qinyuan[J]. Drilling Engineering, 2007,34(5):43-44,46.