Excessive land subsidence occurred because of drainage consolidation and backfill loading for soft clay foundation of a workshop, static pressure grouting with sleeve valve pipe and anchor static pressure pile underpinning technique were adopted to consolidate the soft ground foundation, and the technical features, consolidation mechanism and construction technology were introduced in this paper.
参考文献
相似文献
引证文献
引用本文
丁国雄 谯伟.深厚软土地区某厂房基础沉降原因分析和对策[J].钻探工程,2007,34(5):8-11.DING Guo-xiong, QIAO Wei. Analysis on Cause of Workshop Foundation Subsidence in Deep Thick Soft Ground Area and the Countermeasure[J]. Drilling Engineering, 2007,34(5):8-11.