The paper summed up the developing course from ferroconcrete uplift pile to pre-stressed uplift pile and three methods for study on property of uplift pile: field test,model test and theoretical analysis.On the basis of less cost,convenient construction and efficient environment protection,a new type pre-stressed uplift pile is put forward.
参考文献
相似文献
引证文献
引用本文
朱世平 杜高恒 何世鸣 贾城 杨敏.抗拔(浮)桩的发展历程和研究方向[J].钻探工程,2007,34(5):5-7,11.ZHU Shi-ping, DU Gao-heng, HE Shi-ming, et al. Development and Research Direction of Uplift Pile[J]. Drilling Engineering, 2007,34(5):5-7,11.