Based on the case analysis on pre-stressed tubular pile construction in Shantou district in these years, according to the characters of engineering geological condition and working experience, some discussion on design and construction of pre-stressed tubular pile are made.
参考文献
相似文献
引证文献
引用本文
林志文.预应力管桩在汕头地区施工中几个问题的探讨[J].钻探工程,2007,34(2):13-15.LIN Zhi-wen. Study on Application of Pre-stressed Tubular Pile in Shantou District[J]. Drilling Engineering, 2007,34(2):13-15.