隧道长管棚超前支护施工工艺及其对钻机性能要求探讨
DOI:
CSTR:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

U455.4

基金项目:


Discussion on Construction Technology of Long Pipe-shed Pre-reinforcement for Tunnel and Feature Requirement of Drilling Machine
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    结合65m长管棚超前支护的施工实例,介绍了海王星-508型钻机在长管棚施工中采用的施工工艺,并探讨了长管棚施工对钻机的性能要求。

    Abstract:

    With the construction case of 65 m long pipe-shed pre-reinforcement, the paper introduced the construction technology of long pipe-shed whh Haiwangxing - 508 drilling machine, and discussed the feature requirement of drilling machine in the construction.

    参考文献
    相似文献
    引证文献
引用本文

夏邦瑶 代金旭 罗家详.隧道长管棚超前支护施工工艺及其对钻机性能要求探讨[J].钻探工程,2007,34(12):52-54.
XIA Bang-yao, DAI Jin-xu, LUO Jia-xiang. Discussion on Construction Technology of Long Pipe-shed Pre-reinforcement for Tunnel and Feature Requirement of Drilling Machine[J]. Drilling Engineering, 2007,34(12):52-54.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2007-05-30
  • 最后修改日期:2007-08-17
  • 录用日期:
  • 在线发布日期:
  • 出版日期:
文章二维码