苏通长江公路大桥试验钻孔施工工艺
DOI:
CSTR:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

U443.154

基金项目:


Construction Technology of Testing Borehole in Changjiang Highway Bridge of Suzhou - Nantong
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    苏通长江公路大桥主塔基础采用巨型群桩基础,施工前要模拟水上钻孔桩进行钻孔工艺试验,试验钻孔的技术要求高于现行规范要求。介绍了试验钻孔施工技术及取得的成果。

    Abstract:

    Heavy pile group foundation was taken as the main pylon for Changjiang highway bridge of Suzhou - Nantong, hole boring technique was tested through simulating borehole pile in water before construction by overtopping current specifications. The result of construction technology of testing borehole was introduced in this paper.

    参考文献
    相似文献
    引证文献
引用本文

杨宗仁.苏通长江公路大桥试验钻孔施工工艺[J].钻探工程,2007,34(1):21-23.
YANG Zong-ren. Construction Technology of Testing Borehole in Changjiang Highway Bridge of Suzhou - Nantong[J]. Drilling Engineering, 2007,34(1):21-23.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2006-11-07
  • 最后修改日期:2006-11-07
  • 录用日期:
  • 在线发布日期:
  • 出版日期:
文章二维码