According to the borehole diameter shortening and drilling tool jamming accident in Yilan, the basic reason was thought to be rapidly - thickening mud cake on the wall of borehole in crack development in some rock stratum with high permeability and absorbency, but not to be rock expanding. Concrete measures for the accident prevention were put forward.
参考文献
相似文献
引证文献
引用本文
魏臣.对依兰煤田钻孔缩径挤夹钻具事故的认识[J].钻探工程,2007,34(10):29-31.WEI Chen. Analysis on Borehole Diameter Shortening and Drilfing Tool Jamming Accident in Yilan Coalfield[J]. Drilling Engineering, 2007,34(10):29-31.