TU473.14
针对滨海潮间带复杂地层条件下冲击成孔灌注桩孔壁坍塌问题,依据工程实例,总结了几个解决的办法,效果良好。
李先经,刘心起.滨海潮间带复杂地层条件下冲击成孔灌注桩塌孔事故的预防及处理[J].钻探工程,2006,33(8):35-35,50.. Precaution and Treatment to Collapse of Percussive Bored Cast-in-place Pile in Complex Formation in Tideland by the Sea[J]. Drilling Engineering, 2006,33(8):35-35,50.