The shortage of bearing capacity is often encountered in pile foundation construction in complex schist area. The main causes are studied with a typical case, and the problems that should be paid attention to at the similar stratum are also mentioned.
参考文献
相似文献
引证文献
引用本文
谌伟,彭月英.复杂片岩地区桩基工程实践[J].钻探工程,2006,33(8):21-23.SHEN Wei, PENG Yue-ying. Pile Foundation Construction in Complex Schist Area[J]. Drilling Engineering, 2006,33(8):21-23.