土钉墙与预应力锚杆联合支护技术
DOI:
CSTR:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

TU473.2

基金项目:


Composite Support Technique for Soilnailing Wall and Prestressed Anchor
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    北京市深基坑工程中土钉墙支护技术应用比较广泛,对于边坡变形要求严格的基坑,采用土钉墙与预应力锚杆联合支护技术可有效控制变形,结合工程实例,介绍了该技术的设计思路及应用过程,说明了该技术的适用性,并就施工中遇到的问题进行分析,给出相应的处理措施。

    Abstract:

    The technique of soilnailing wall is widely applied in Beijing, and the composite support technique for soil-nailing wall and pre-stressed anchor can efficiently control the deformation. The design way and the applicability of this technique is illustrated with a field case, and analysis on some problems encountered during construction are made with the corresponding measures.

    参考文献
    相似文献
    引证文献
引用本文

杨生彬.土钉墙与预应力锚杆联合支护技术[J].钻探工程,2006,33(8):8-10,16.
YANG Shengbin. Composite Support Technique for Soilnailing Wall and Prestressed Anchor[J]. Drilling Engineering, 2006,33(8):8-10,16.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2006-02-28
  • 最后修改日期:2006-02-28
  • 录用日期:
  • 在线发布日期:
  • 出版日期:
文章二维码