Abstract:The various measures, such as pre-casting through advanced installed pipe shed, grille steel frame or profiled bar support, top arch net, system rockbolt, and injecting concrete, were used to deal with the technical difficulties under bad geological conditions during excavation of tunnel within V type surrounding rocks. The tunnel section of 574 m length was safely excavated through V type surrounding rocks, including 3 broken belts. The fore shaft was successfully made.