According to the geological conditions of runway system in Pudong Airport,testing proposal of "well point dewatering Cushion impaction and grind" was put forward and was monitored and detected during the testing procedure.Test data was analyzed to provide direct basis for design,construction and working out the detecting standard for large scale subgrade treatment.
参考文献
相似文献
引证文献
引用本文
苏尔好.浦东机场跑道冲击碾压地基处理试验研究[J].钻探工程,2006,33(12):9-13.SU Er-hao. Experimental Investigation on Subgrade Treatment of Runway with Impaction and Grind Method in Pudong Airport[J]. Drilling Engineering, 2006,33(12):9-13.