Through the comparison and analyses of data collected from recently drilled well in Erdos Work Area, the bit model and drilling parameters of each well section and each district were optimized. The penetration rate was increased and the period of well completion was shortened. It make the drilling technology[KG*2]in North Hubei step up new footstep and speed the construction of the Erdos Gas Field.
参考文献
相似文献
引证文献
引用本文
李德红.鄂北工区钻头型号及钻井参数的优化[J].钻探工程,2005,32(8):50-54.LI De-hong. Optimization of Bit Model and Drilling Parameter in Erdos Work Area[J]. Drilling Engineering, 2005,32(8):50-54.