摘要:
绍了采用控制爆破拆除大跨度工业厂房的施工方法,主要论述了在要求振动较小情况下,怎样控制爆破参数。
Abstract:
The paper describes the construction methods of demolishing large-span industrial plant with controlled blasting, and mainly introduces how to control the blasting parameters under the demand of less vibration.
参考文献
相似文献
引证文献
引用本文
袁长征,张锦灵.洛阳热电厂汽机主厂房2、3号机房爆破拆除技术[J].钻探工程,2005,32(7):58-60.YUAN Chang-zheng, ZHANG Jin-ling. Blasting Demolishing Two Engine Rooms of Luoyang Thermoelectricity Power Plant[J]. Drilling Engineering, 2005,32(7):58-60.