曾蔚,张民庆.圆梁山隧道施工期间增加辅助坑道的设计与施工[J].钻探工程,2005,32(5):56-59.ZENG Wei, ZHANG Min-qing. The Design and Engineering for Additional Accessorial Tunnels While the Main Tunnel Is under Construction in Yuanliangshan Tunnel[J]. Drilling Engineering, 2005,32(5):56-59.
复制